PBTool010 | WEALTHLOCK

Purpose
Confirm whether mapped wealth placement is structurally locked and able to sustain inflow.
Test stability, capacity, and integrity before expansion.

Function
• Test structural capacity to hold inflow
• Verify integrity (law-aligned vs temporary build)
• Confirm sustainability under pressure
• Assess structural match for expansion without collapse

When to Use
• Before activating or expanding wealth threads
• At any point of suspected instability, drift, or collapse

STRUCTURE STATUS

Current wealth structure under law:

Locked and stable
Structure coherent; build holds; proceed with inflow

Partial hold
Structure present but incomplete; stabilise before continuing

Unstable
Drift, leak, or collapse detected; correct before building

No structure
Nothing present to hold inflow; return to Wealth Placement Map


CAPACITY

Capacity to hold inflow:

Capacity matched
Inflow aligns with structure; build can continue

Capacity stretched
Structure at limit; stabilise or reinforce before continuing

Capacity exceeded
Inflow beyond hold; collapse imminent unless scaled back


INTEGRITY

Integrity of the build:

Structural integrity
Law-aligned, repeatable; sustain inflow

Unsecured build
Temporary hold, not law-locked; reinforce before continuing

Integrity collapse
False build; reset before attempting inflow


SUSTAINABILITY

Sustainability under load:

Sustained hold
Placement coherent; inflow continues without leak

Partial hold
Coherence unstable; stabilise before building

Unsustainable
Drift, leak, or collapse evident; correct or reset structure


BUILD CONDITION

Readiness to expand without collapse:

Build-ready
Coherent, law-locked; increase inflow or expand directive

Limited build
Capacity partial; expand gradually or risk strain

Unbuildable
Cannot take additional load; stabilise first


FIELD RESPONSE

Markers confirming stability:

Stable inflow
Coherence visible; placement holds, inflow sustained

Distorted inflow
Response present but misaligned; requires correction

No inflow
Silence; no confirmation of wealth hold

Overload
Response exceeds capacity; overwhelms build


WEALTH MOVEMENT

Action confirmed by stability:

Build
Structure stable; continue thread and inflow build

Stabilise
Hold and reinforce before continuing

Correct
Adjust structure or role before reactivating

Re-enter
Collapse confirmed; return to Wealth Placement Map


SYSTEM CONFIRMATION

Wealth stability confirmed against law and field response:

  • Structure, capacity, integrity, and sustainability verified

  • Build condition tested

  • Wealth movement assigned

SEAL

Hold confirmed stability until the field locks or reassigns.
Proceed only when law confirms structural capacity to build.