PBTool010 | WEALTHLOCK
Purpose
Confirm whether mapped wealth placement is structurally locked and able to sustain inflow.
Test stability, capacity, and integrity before expansion.
Function
• Test structural capacity to hold inflow
• Verify integrity (law-aligned vs temporary build)
• Confirm sustainability under pressure
• Assess structural match for expansion without collapse
When to Use
• Before activating or expanding wealth threads
• At any point of suspected instability, drift, or collapse
STRUCTURE STATUS
Current wealth structure under law:
☐ Locked and stable
Structure coherent; build holds; proceed with inflow
☐ Partial hold
Structure present but incomplete; stabilise before continuing
☐ Unstable
Drift, leak, or collapse detected; correct before building
☐ No structure
Nothing present to hold inflow; return to Wealth Placement Map
CAPACITY
Capacity to hold inflow:
☐ Capacity matched
Inflow aligns with structure; build can continue
☐ Capacity stretched
Structure at limit; stabilise or reinforce before continuing
☐ Capacity exceeded
Inflow beyond hold; collapse imminent unless scaled back
INTEGRITY
Integrity of the build:
☐ Structural integrity
Law-aligned, repeatable; sustain inflow
☐ Unsecured build
Temporary hold, not law-locked; reinforce before continuing
☐ Integrity collapse
False build; reset before attempting inflow
SUSTAINABILITY
Sustainability under load:
☐ Sustained hold
Placement coherent; inflow continues without leak
☐ Partial hold
Coherence unstable; stabilise before building
☐ Unsustainable
Drift, leak, or collapse evident; correct or reset structure
BUILD CONDITION
Readiness to expand without collapse:
☐ Build-ready
Coherent, law-locked; increase inflow or expand directive
☐ Limited build
Capacity partial; expand gradually or risk strain
☐ Unbuildable
Cannot take additional load; stabilise first
FIELD RESPONSE
Markers confirming stability:
☐ Stable inflow
Coherence visible; placement holds, inflow sustained
☐ Distorted inflow
Response present but misaligned; requires correction
☐ No inflow
Silence; no confirmation of wealth hold
☐ Overload
Response exceeds capacity; overwhelms build
WEALTH MOVEMENT
Action confirmed by stability:
☐ Build
Structure stable; continue thread and inflow build
☐ Stabilise
Hold and reinforce before continuing
☐ Correct
Adjust structure or role before reactivating
☐ Re-enter
Collapse confirmed; return to Wealth Placement Map
SYSTEM CONFIRMATION
Wealth stability confirmed against law and field response:
Structure, capacity, integrity, and sustainability verified
Build condition tested
Wealth movement assigned
SEAL
Hold confirmed stability until the field locks or reassigns.
Proceed only when law confirms structural capacity to build.